Reliability
Maintainability
Availability
Safety Management
Risk Management
Railway RAMS
Combat Management System
Airport Management System
Energy Management System
Press
01-Aug-2016
A tie up between Reliability Solutions, UK and Reliability Centre India
Reliability Solutions, UK and Reliability Centre India have tied up together to provide a TOTAL solution to companies that require to improve and manage BOTH Product and Software Reliability, a service that is simply not available at this level in today's consulting market

Martin Shaw , MD Reliability Solutions brings over 30 yrs of Hardware Reliability Experience into this new offering with Birinder Singh , of Reliability Centre India who also brings 25 yrs of experience in Reliability and Safety Planning, Management and Software Reliability Testing

The services they can provide to Electronics Design and Manufacturing companies include the following:-

(1) Reviewing Reliability programmes of clients and advising how to make most efficient Defect Detection Reliability Test Plans at lowest possible cost
(2) Reviewing client manufacturing processes to assess their ability to detect and manage process reliability defects which escape to the field and fail in Early Life stage of the products lifetime
(3) Develop World Class reliability Improvement programmes focussing on all necessary areas;
- Design Quality
- Design for Manufacture
- Early Life Reliability
- Process defect performance
- Accelerated Life Testing
- New Product Introduction control

(4) Set up efficient Process / Quality / Reliability Reporting methodology for Senior Management use to drive the improvement actions in correct areas that will drive improvement / cost reduction
(5) Develop Sub-Assembly and Full Assembly Early Life Reliability Test programmes for immediate Field Failure Reduction and Cost Saving
(6) Develop unique Accelerated Life Testing for any Electronic or Electro-Mechanical Product
(7) Develop the ‘Reliability Solutions’ model for predicting early Life Field Failure Rates using process yield data
(8) Define and Develop a Unique Design Maturity Measurement approach for each client to measure progress and growth of Design Quality / Reliability through the Design Cycle
(9) Teach efficient DFMEA methodology tailored to each client’s product type and culture which will have direct link and effect on Reliability Improvement
(10) Provide dedicated Reliability Training, can be tailored to each client’s needs
(11) Setting up Internal client Reliability Assessment scoring using the ‘Reliability Solutions’ model
(12) Perform overall Client GAP Analysis to identify ALL weak areas which require improvement to reach World Class Reliability Levels, includes focus on;
- Process measurement/performance
- Reliability test upgrades for Early Life and Long Life
- Use of FMEA, Design and Process
- Supplier component Quality improvement
- Design Quality Testing improvements and setting up Design Maturity Scoring/ Measurement
- Executive Reporting methodology to ensure focus only on keyt areas that will directly drive Quality/Reliability Improvement
- Upgrading New product Introduction (NPI) Assessment and Scoring methods to provide overall NPI score that will relate directly to ability to provide World Class Reliability
11-Jan-2015
Reliability Centre India to provide System Assurance (RAMS) Engineering services Singapore Technologies, Singapore
In November 2013, ST Electronics secured from Marubeni Corp and Toshiba Corp Joint Venture (MTJV Thailand Co. Ltd), a contract worth over S$85m for the supply of rail electronics solutions for the Mass Rapid Transit (MRT) Purple Line in Bangkok, Thailand.

ST Electronics will design, supply, install and commission a turnkey integrated solution for Communications, Supervisory Control and Data Acquisition (SCADA) system, Automatic Fare Collection System (AFC) and Platform Screen Door System (PSD) for the Bangkok MRT Purple Line.

ST Electronics has contracted Reliability Centre India to provide RAMS services for the Purple Line Project for a period of 16 months till the year 2017. The services being provided by Reliability Centre India include the delivery of the following documents:-


(1) System Safety Plan
(2) Sub System Hazard Analysis (SSHA)
(3) FTA
(4) Interface Hazard Analysis (IHA)
(5) SIL Allocation (sub system level)
(6) SCIL
(7) Operation & Maintenance Hazard Analysis (OMHA) Report
(8) System Hazard Log
(9) Safety Analysis Report
(10) Proof of Safety
(11) RAM Plan
(12) RAM Analysis Report
(13) RAM Demonstration Plan
(14) FMECA (sub system level)
(15) RCIL
(16) Reliability Test Plan
(17)RAM Report
03-Feb-2014
Reliability Centre India engaged as sub contractor to AECOM for DFCCI project in India
Birinder Singh of Reliability Centre India was engaged by AECOM as a sub consultant to Identify and Detail the Reliability, Availability, Maintainability and Safety (RAMS) performance requirements for execution of a contract by D&B contractor of the Dedicated Freight Corridor Corporation of India (DFCCI).

The RAMS performance requirements were defined for the following rail systems:-

(i)Electric Traction System
(a) Traction Power Supply System
(b) Traction Power Distribution System
(c) SCADA system

(ii) Signalling System

(iii) Telecommunication System

The aim of the engagement was to produce Bid documents for the Eastern Sector of Dedicated Freight Corridor. The engagement included meetings and presentations to DFCCI and World Bank.

First << 1 2 >> Last

Project in Zambia
We managed US $2.3 million project of laying Optical Fibre cable and setting up antennas on Mobile Telephone towers in Malawi and Zambia.

Projects with Siemens
We undertook RAMS analysis of BHS system designed by Siemens for their projects in India and Thailand.

Software Audit
We have conducted manual testing and auditing of the software. Common problems and software failures encountered in e-governance projects.